Priority · statewide speed-reduction prioritisation

TAC programme view — state level first. Ranked by Collective Risk (FSI/km/yr); geography refines, it does not precede value.
Scenario:

Map — corridors coloured by Collective Risk

Supply curve (CR order)

Walking the CR-ranked list top-down: cumulative ΔFSI/yr saved vs cumulative veh-hours. Direct cost only, no reassignment.

Signals & outliers (measured-speed corridors)

Ranked corridors — CR is the sort

Road (LGA)kmCRcovPRAADTlimitFSI/yrΔFSIcost vh/yr
CR = MODELLED expected FSI/yr per km (NB-GLM full-population layer, temporal holdout obs/exp 0.968; FSI-count outcome, NOT FSI-Equivalent severity-weighted). Whole-road basis: all sections ÷ full length. PR = FSI per 100M VKT (VKT-weighted). Crash points = FSI history 2012–2024 (fatal red, serious orange) — observed history, distinct from modelled CR. ΔFSI = FSI × (1−e^(−β·Δv̄)), β=0.08 (Elvik et al. 2019); Δv̄=0.5×step. Sources: crashstats risk layer, banded AADT, Victorian speed zones May 2026, connected-vehicle speed tiles (Jul 2026). Casualty-savings claims pending EB/CMF gate. crashstats.com.au family.